←Industries
Energy
- The work
- Two phases and the interface between them
- What decides it
- Where the surface is, and how sharp
- Cost of being wrong
- A separator sized on a wrong answer
What Courant catches here
- 01Unbounded phase fractionalpha max 1.0004
It is bounded every step, until the step is too long.
- 02The wrong Courant number1.11 reported · 1.24 actual
The interface number reported in place of the bulk one, which is the one that bites.
- 03Convergence on a moving fieldjudged on alpha
A run called converged on a residual that measures interface motion.
What comes back
- The cause, and the line of solver output it came from
- The change, as a diff you can reverse
- Four physics checks, measured against their limits
- A record somebody else can open on a link
What this work is held to
- ASME V&V 20Verification and validation in CFD and heat transfer
- IEC 61508Functional safety of electrical and electronic systems
- ASME BPVCBoiler and pressure vessel code
Courant holds none of these certifications. It produces the verification record they ask you to keep.